Buildout keeps pace
Track transmission placed in service, interconnection times, and megawatts of verified flexible load.
Three plausible energy futures, the assumptions behind them, and the evidence that would change our minds.
These are qualitative scenarios, not forecasts, targets, or investment recommendations. The 10-year view asks what can be delivered. The 20-year view asks how those decisions compound. Different regions may follow different paths at the same time.
| Scenario and assumption | 2036 · 10 years | 2046 · 20 years |
|---|---|---|
| Buildout keeps pace Grid investment, permitting, and flexible demand keep up with electrification. | New loads are connected alongside transmission, storage, and firm capacity. Operators increasingly reward customers that can move some demand outside stressed hours. | A larger share of end-use energy is delivered as electricity. Local bottlenecks still matter, but a stronger transmission network makes resources available across regions. |
| Demand outruns the grid Data centers, industry, and electrification move faster than generation and network construction. | Large-load connection dates slip and some customers seek on-site generation. The debate shifts to who pays for reserve capacity and upgrades. | Outcomes diverge by region. Some grids catch up and attract industry; others face higher costs or lose proposed investment. Fuel exposure depends on what gets built. |
| Fuel and material supply fragments Trade restrictions, concentrated refining, or disruptions raise the cost of inputs. | Utilities and manufacturers look for alternative suppliers and longer contracts. Some projects are redesigned or delayed rather than canceled outright. | Part of the supply chain diversifies, but the cost and reliability of access to fuels, metals, and components still differ significantly by region. |
Track transmission placed in service, interconnection times, and megawatts of verified flexible load.
Watch signed service agreements, project delays, and actual hourly peaks relative to load forecasts.
Track producing and processing shares, contract terms, inventories, and the commissioning of alternative supply.
Our publishing plan: Record what changed in regional buildout briefings, compare published demand forecasts with observed data where they’re comparable, and revisit each scenario when the evidence changes.
See the first regional briefing · Explore the supply chain inputs
Test a plan against more than one future before deciding who pays for the capacity. The IEA’s global scenarios and the EIA’s U.S. cases are source material, not the authors of this outlook.
IEA scenario methodology · EIA Annual Energy Outlook cases · Independent Davos briefing